1. Home > 
  2. Topics >Water Quality Accident Response Drill to be held on Gunma Canal

Water Quality Accident Response Drill to be held on Gunma Canal

November 10, 2016

     Gunma Canal, located along the northwestern edge of the Kanto Plain in Gunma Prefecture, is one of the very important facilities to provide one million residents in those districts with domestic water and 300 ha of farmland in eight municipalities of central Gunma Prefecture with irrigation water. As there was an accident of illegal oil dumping into Akagi Main Canal in 2008, it became more important to be prepared for a water quality accident. To make an advanced preparation against such a water quality accident, Gunma Canal Operation and Maintenance Office is going to hold the water quality accident response drill to focus on the oil leakage accident, inviting related water users and municipal office staff members so as to conduct proper and prompt responses in coordination with each other.

(Outline of the drill)
-Date and Time: 17th November, 2016 from 1:30 pm till 4:00 pm
- Participating organizations: Central Prefecture No.1 & No.2 Water Works Office, Gunma Canal Land Improvement District, various prefectural and municipal offices, and other relevant private companies
-Type of drill performed: installation of oil fence mats and others on the main canal (See the photos below.)
-Location: Hirobaba No.1 Open canal, Haruna Main Canal, Gunma Canal
(Note) Parking lot is available and picture taking is allowed.

(Timeline o the drill)
Date:  17th November, 2016

 

  • 13:30- Greetings and briefing
  • 14:30- Practice of rope work
  • 15:00- Installation of oil fences
    (We are inviting the participants from other organizations on oil fence installation practice and oil absorption mat throw-in)
  • 16:00 End of the drill


-Night view of Urayama Dam -

Preparation of oil fences

Installing oil fences

After installation of oil fences

 

 

Gunma Canal Composition
 

 

 

 

 

PageTop