top < The History of Flooding and Flood Control on the Nagara River < Flood Control During the Horeki Period

The History of Flooding and Flood Control on the Nagara River

Flood Control During the Horeki Period

In the mid-Edo period (1603-1866), the Shogunate assigned flood control work (known as Horeki period flood control) to the Shimazu clan, who constructed the Aburajima cofferdam and other works between 1754 and 1755.

Viewing downstream from Kiso Sansen Park
Viewing downstream from Kiso Sansen Park

Extent of flood control work during the Horeki period and a rough map of the area at that time (1755)
Extent of flood control work during the Horeki period and a rough map of the area at that time (1755)

Distribution of ringed land communities before Meiji period conservation
Distribution of ringed land communities before Meiji period conservation